isaraerospace
Director Spectrum Value Stream (m/f/d)
Parsdorf, Bavaria · posted 2026-11-14 · listed from another job board
Source: Arbeitnow — view original listing and apply. No platform account required.
At a glance
- Workplace
- Onsite
- Location
- Parsdorf, Bavaria
- Seniority
- Director
- Skills
- AI
- Posted
- 2026-11-14
About the job
<p><strong>Mission Brief </strong></p> <p><span class="TextRun SCXW204159307 BCX0" lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW204159307 BCX0">Own end-to-end Spectrum industrial delivery across Block 2 and Block 4, from raw material supply to launch-ready vehicle handover. Treat Mission Launch Operations as the internal customer and be accountable for delivering launch vehicles on time, every time, to the agreed cadence and acceptance criteria. Lead the Value Stream teams to cascade these commitments across functions and sites, securing an executable plan with VP Spectrum Production and other functional owners.</span></span> </p> <p>Your Role in Our Space Mission: </p> <ul> <li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"singleLevel"}" data-aria-posinset="1" data-aria-level="1"><strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Cascade cadence horizontally. </span></span></strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">With Operational Planning, work backwards from customer handover dates through launch-pad AIT, logistics, vehicle integration, engine test, manufacturing, suppliers and raw materials. Translate cadence into linked milestones, lead times, buffers and capacity requirements, with named owners and committed dates. Verify readiness at each handover and resolve gaps across the full flow.</span></span><span data-ccp-props="{"201341983":0,"335559739":80,"335559740":240}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"singleLevel"}" data-aria-posinset="2" data-aria-level="1"><strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Own the customer commitment. </span></span></strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Be the accountable industrial delivery interface to Mission Launch Operations. Agree vehicle delivery dates, launch cadence, configuration, readiness and handover criteria. Maintain a shared view of plan, target and forecast for every vehicle; communicate risks early, lead recovery and agree changes through authorised governance.</span></span><span data-ccp-props="{"201341983":0,"335559739":80,"335559740":240}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"singleLevel"}" data-aria-posinset="3" data-aria-level="1"><strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Lead the Block 2 and Block 4 teams. </span></span></strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Set objectives and hold Value Stream Leads accountable for delivery integration, readiness and recovery. Protect clear focus on current vehicle delivery and future product industrialisation, managing dependencies and configuration transitions between blocks.</span></span><span data-ccp-props="{"201341983":0,"335559739":80,"335559740":240}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{"335552541":1,"335559685":360,"335559991":360,"469769226":"Symbol","469769242":[8226],"469777803":"left","469777804":"","469777815":"singleLevel"}" data-aria-posinset="4" data-aria-level="1"><strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Drive critical-path recovery. </span></span></strong><span data-contrast="auto"><span data-ccp-parastyle="List Bullet">Identify constraints driving milestone deviations and secure sequenced recovery commitments from functional owners. Agree production and AIT interventions with VP Spectrum Production; verify their impact on delivery and escalate unresolved capacity, funding or priority conflicts.</span></span><span data-ccp-props="{"201341983":0,"335559739":80,"335559740":240}"> </span></li> </ul> <ul> <li data-leveltext="" data-font="Symbol" data-listid="1" data-list-defn-props="{"335552541"…